add share buttonsSoftshare button powered by web designing, website development company in India

Identify Constructability Issues For Various Trades With BIM

Saturday , 12, September 2020 Comments Off on Identify Constructability Issues For Various Trades With BIM

BIM (Building Information Modeling) helps review building plans by identifying structural problems during the preparation stage. Implementing BIM highlights potential bottlenecks and design flaws that can lead to cost overruns and processing. The entire project process is assessed using BIM prior to construction. 

All project analyses can be carried out from conception to manufacture to identify problems that may arise due to design mismatches, spatial conflicts, traffic, logistics, and more. Design revisions and updates can also be tracked during project development. In addition, BIM helps improve site processes. However, many people also prefer to get BIM  outsourcing services via several companies such as BM Outsourcing for efficient completion of work.

The Right Tool for the Job: Using BIM to Improve Outcomes - C.W. Driver

Image Source: Google

Let's take a look at how BIM can help solve design issues for various transactions

Electrical Trading:

Electrical drawings of a large building may not be understood and interpreted the same by all project participants. 3D BIM collaboration is an effective way to bring all project participants together on the same platform. BIM coordination at the highest level ensures fast and error-free design and reduces changes and processing orders generated on-site. 

Concrete:

BIM helps identify some inconsistencies in input images and incomplete information about the concrete trade. Several conflicts have been identified that could affect the actual design in terms of costs, materials, and labor. BIM minimizes losses by reviewing structures such as changing pouring order, changing matt plate thickness, opening floor openings, and more.

HVAC Trading: 

BIM coordination helps identify collisions and turn them into consultants, resulting in design redesigns. Coordination problems are solved by validating drawings based on Fume hood collisions with structures walls and other transactions. The final HVAC model was created by eliminating collisions by directing and resizing channels, as well as changing their height. This assists the pre-assembly in quality management, reducing installation time, losses, and costs.